名称+510m排水平巷1规格3.2×2.5可掘支护巷道日长度进度工作日方式1842933161383162003001747月份工作日12036219326427527627727828927102711281228合计3111841.833333.63102981054610556100砌帮砌碹架箱架箱架箱架箱架箱34.246.848.618.445818184275818476+547m水平小白炭运2.4×2.4输巷2#采面运输巷2.2×2293316138小白炭2+547m水平小白炭回2.4×2.4风巷2#采面回风巷2#采面开切眼小白炭回风暗斜井小 计+440m运输暗斜井1+4001采面运输巷3.6×32.2×22.2×21.8×1.82.4×2.4605721548181811968.410130.8518116284168841603162003001747176961.8331.833.69810011216210046砌碹架箱架箱砌碹架箱架箱91.2122130144162168185159176300335291299165156633133634.246.848.610.863818175581818484300335292+4001采面下回风巷2.2×2+440m回风暗斜井3.6×33634.246.848.648.648.628.8308481812364.81002+4001采面上回风巷2.2×2+4001采面开切眼1.8×1.8299165小 计合 计7268.493.697.216816021522712226713029214030816434916232116232417234018415673443314