工程进度款审核表

2023-03-04 来源:客趣旅游网
二、工程施工费用( 月份)审核表

工程名称:兴隆分发中心工程(一期)

货币单位:人民币元细目编号承包人申报量截止2012截止2012年11月单合同单合同总数量合同合价或金额年11月份位价份完成金额完成工程量完成金额完成数量3735974.003735974.003735974.003735974.00236.82813.29144.8813.48148.571732082.0099121.001136704.00118533.00381072.0089467.0053352.00125643.004464231.004464231.00268.7241965359.00268.72236.8313.29144.8813.48148.573735974.003735974.001732082.0099121.001136704.00118533.00381072.0089467.0053352.00125643.004464231.004464231.001965359.00268.724236.82813.29144.8813.48148.57监理部审核量备注完成工程量完成金额3735974.003735974.001732082.0099121.001136704.00118533.00381072.0089467.0053352.00125643.004464231.004464231.001965359.00项目名称1#仓库一123456781#仓库金属结构工程钢屋架制作钢柱制作tt236.8287313.6713.297458.31732082.0099121.001136704.00118533.00381072.0089467.0053352.00125643.004464231.004464231.00钢檩条制作(部位:屋面、雨篷槽钢檩条及檩托板)t钢支撑制作144.887845.8313.4818792.5848.577845.83t钢檩条制作(位置:墙面槽钢檩条及檩托板)t措施费规费税金3#仓库一13#仓库金属结构工程钢屋架制作t268.7247313.671965359.00第 1 页,共 2 页

二、工程施工费用( 月份)审核表

工程名称:兴隆分发中心工程(一期)

货币单位:人民币元细目编号2承包人申报量截止2012截止2012年11月单合同单合同总数量合同合价或金额年11月份位价份完成金额完成工程量完成金额完成数量t19.9237458.3148592.0019.923148592.0019.923148592.00监理部审核量备注完成工程量19.923完成金额148592.00项目名称钢柱制作3钢檩条制作(部位:屋面、雨篷槽t钢檩条及檩托板)钢支撑制作(部位:屋面拉条、撑管、隅称)钢支撑制作(部位:屋面系杆及连接板)钢支撑制作(部位:墙面ZC)钢檩条制作(部位:墙面槽钢檩条及檩托板)措施费规费t146.897845.831152474.00146.891152474.00146.891152474.00146.891152474.0047.5688555.7464750.007.56864750.007.56864750.007.56864750.0056789t14.9498555.7417.9758792.5866.767845.83127900.00158047.00523788.00108736.0064454.00150131.008200205.0014.94917.97566.76127900.00158047.00523788.00108736.0064454.00150131.008200205.0014.94917.97566.76127900.00158047.00523788.00108736.0064454.00150131.008200205.0014.94917.97566.76127900.00158047.00523788.00108736.0064454.00150131.008200205.00tt10税金合计制表人:

施工单位审核意见:

建设单位审核意见:第 2 页,共 2 页

制表日期: 年 月 日

因篇幅问题不能全部显示,请点此查看更多更全内容